
Our OpenWorld preparations are at a fever pitch right now and I can barely see the top of my inbox. One of my colleagues, Biju Mohan, has an OpenWorld session that will be useful if you’re evaluating the Applications Management Pack. As part of his session,
Biju and a Program Manager from GE Infrastructure will be discussing how GE Infrastructure running multiple Oracle E-Business Suite production systems was able to save $200k and also reduce DBA time by 84% by using
Application Management Pack (AMP) for Oracle E-Business Suite (AMP).
Biju plans to cover:
Case Study by GE Infrastructure
AMP: Today and What’s New
AMP Roadmap
Session Details:
- Session Name: Customer Case Study: Centrally Managing Your Oracle E-Business Suite, Using Oracle Application Management Pack (Session S298395)
- Date: 23rd September 2008 (Tuesday)
- Time: 09.00 to 10.00 a.m
- Location: Moscone West 2007
Related Articles
