X

PaaS Partner Community

Building OSB 12c releases on resource level using Maven by Mike Heeren

Juergen Kress
PaaS Partner Adoption

 image

A while ago I published a Whitebook (in Dutch) about building OSB 12c releases on resource level using Maven. In the Whitebook, you could read which functionality we were missing in the regular Oracle Service Bus plugin for Maven and how we were able to create this functionality using a custom Maven plugin.

I have added the code of this custom Maven plugin to the following public repository: https://bitbucket.org/whitehorsesbv/servicebusplugin

Used settings

The custom Maven plugin has been developed and tested on multiple environments, so we can confirm that the Maven plugin is working if you are using the following version(s):

Application

Version

Java

1.7.0_79, 1.8.0_101

Maven

3.3.9

Oracle Service Bus

12.1.3, 12.2.1

Installing the custom Maven plugin

First start to install the custom Maven plugin to your local Maven repository. To do this, you can download both the JAR and the POM file from the download page of the repository. After you have downloaded both files, you can execute the following commands to install it to you local Maven repository: Please read the complete article here.

SOA & BPM Partner Community

For regular information on Oracle SOA Suite become a member in the SOA & BPM Partner Community for registration please visit www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center.

Blog Twitter LinkedIn image[7][2][2][2] Facebook clip_image002[8][4][2][2][2] Wiki

Technorati Tags: SOA Community,Oracle SOA,Oracle BPM,OPN,Jürgen Kress

Be the first to comment

Comments ( 0 )
Please enter your name.Please provide a valid email address.Please enter a comment.CAPTCHA challenge response provided was incorrect. Please try again.