Using Load Plan for managing your ETL task in BI Apps 11.1.1.7.1 (1)

One of the major change introduced in BI Apps 11.1.1.7.1 is the way
how we manage the ETL task sequence and trim the unnecessary tasks.


This functionality was accomplished earlier using DAC.
 The problem we frequently faced was that the DAC repository and the
INFA repository are maintained as two separate repositories.  We have to
sync up the name of tasks exactly in order to use DAC to manage the
task execution of the Informatica workflow tasks.


Load Plan and Load Plan Generator was designed for addressing this requirement.


Here is a good article that describes the story.


Load Plan Generator – An Inside Look

Comments:

Post a Comment:
Comments are closed for this entry.
About

Oracle BI Applications / Oracle Data Warehousing / Oracle E-Business Suite

Search

Archives
« April 2014
SunMonTueWedThuFriSat
  
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
   
       
Today
Feeds