Tuesday Mar 26, 2013

SPARC T5-2 Scores Oracle FLEXCUBE Universal Banking Benchmark World Record Performance

Oracle's SPARC T5-2 server running Oracle FLEXCUBE Universal Banking Release 12 along with Oracle Database 11g Release 2 on Oracle Solaris 11 produced record results.

  • A SPARC T5-2 server running Oracle FLEXCUBE Universal Banking Release 12 and Oracle Real Application Clusters (RAC) Database 11g Release 2 processed 25 million accounts in 150 minutes for the End of Month workloads with an average utilization of 55% and 196 minutes utilizing 20 cores with an average cpu utilization of 85%.

  • A SPARC T5-2 server running Oracle FLEXCUBE Universal Banking Release 12 and Oracle Real Application Clusters (RAC) Database 11g Release 2 processed 25 million accounts in 56 minutes for the End of Day workload utilizing just 20 cores.

  • A SPARC T5-2 server running Oracle FLEXCUBE Universal Banking Release 12 achieved twice the throughput compared to a SPARC T4-4 server (which has twice the number of processors) for End of Month batch processing.

  • A SPARC T5-2 server running Oracle FLEXCUBE Universal Banking Release 12 achieved a record result processing 10.14 million accounts in 28 minutes for the End of Day workload with an average cpu utilization of 72% on a single server.

  • These results demonstrate how SPARC T5 processor systems along with Oracle Solaris 11 can benefit global, private and corporate financial institutions who are running Oracle FLEXCUBE Universal Banking. The uniquely co-engineered Oracle software and SPARC T5 processor based system unlock unique agile capabilities demanded by modern business environments.

  • The SPARC T5-2 system along with Oracle Solaris is able to provide a combination of uniquely essential characteristics that resonate with core values for a modern financial services institution.

  • The SPARC T5 processor based systems are capable of delivering higher performance and lower total cost of ownership (TCO) than older SPARC infrastructure, without introducing the unseen tax and risk of migrating applications away from older SPARC systems.

Performance Landscape

Oracle FLEXCUBE Universal Banking Release 12
End of Month Batch Processing
System Customer
Accounts
Time in Minutes Notes
SPARC T5-2 25M 150.66 RAC (two systems)
SPARC T5-2 10.14M 101.92 single instance
SPARC T4-4 10.14M 108.77 single instance
SPARC T4-4 5M 106.18 single instance, two chips

Oracle FLEXCUBE Universal Banking Release 12
End of Day Batch Processing
System Customer
Accounts
Time in Minutes Notes
SPARC T5-2 25M 56.05 RAC (two systems)
SPARC T5-2 10.14M 27.87 single instance

Configuration Summary

SPARC T5 Configuration:

1 x SPARC T5-2 with
2 x SPARC T5 processors, 3.6 GHz
512 GB memory
1 x SPARC T5-2 with
2 x SPARC T5 processors, 3.6 GHz
256 GB memory
Oracle Solaris 11 11/11
Oracle Database 11g Release 2 (RAC/ASM 11.2.0.3.0)
Oracle FLEXCUBE Universal Banking Release 12.0.1

SPARC T4 Configuration:

2 x SPARC T4-4, each with
4 x SPARC T4 processors, 3.0 GHz
512 GB memory
Oracle Solaris 11 11/11
Oracle Database 11g Release 2 (RAC/ASM 11.2.0.3.0)
Oracle FLEXCUBE Universal Banking Release 12.0.1

Storage Configuration:

3 x Sun Storage 6180 Array with
16 x 300 GB disks, 15K RPM (total of 48)
4 x Sun Storage CSM200 Expansion Trays, each with
16 x 73 GB disks, 15K RPM (total of 64)
Configured as RAID0, ASM external redundancy
Tests run with single instance DB (single node) and with ASM two nodes
ASM configuration identical on both 2 machines
Oracle Database 11g Release 2 ASM 11.2.0.3.0 64bit (19 TB)

Benchmark Description

The Oracle FLEXCUBE Universal Banking Release 12 benchmark models an actual customer bank with End of Cycle transaction batch jobs which typically execute during non-banking hours. This benchmark includes end of day accrual for savings and term deposit accounts, interest capitalization for saving accounts, and interest pay out for term deposit accounts. The results of the benchmark are certified by Oracle and a white paper is published.

End of cycle batch tests are conducted to measure the throughput capabilities of the system. It helps banks to decide the end of cycle processing window required to do the back office processing. The End of Day (EOD) batch test includes the following:

  • Mark End of Transaction Input
  • Value Dated Balance update
  • Interest and Charges (IC) Batch
  • Mark End of Financial Input
  • Mark End of Day
  • Date Change
  • Mark Transaction Input
The End of Month (EOM) batch test includes additional tests. These batches typically execute during non-banking hours. The goal is to ensure that the system is able to complete the batch operations for the planned volumes End of Day (EOD) within 60 minutes and End of Month (EOM) including interest and charges liquidation within 180 minutes.

 

See Also

Disclosure Statement

Copyright 2013, Oracle and/or its affiliates. All rights reserved. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. Results as of 26 March 2013.

About

BestPerf is the source of Oracle performance expertise. In this blog, Oracle's Strategic Applications Engineering group explores Oracle's performance results and shares best practices learned from working on Enterprise-wide Applications.

Index Pages
Search

Archives
« April 2014
SunMonTueWedThuFriSat
  
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
   
       
Today