« Customer Success:How Telstra Saves with Centrally Managed Infrastructure | Main | OCT CPU 2007: Best practices for applying patches through EM »

RAC Lifecycle Management session in OpenWorld

Just wanted to let you know about the following session in open world which describes how Enterprise Manager Grid Control can be used for provisioning, perform single click scale-up and scale down/delete of RAC systems.

 










Session Name: Software Lifecycle Automation of Real Application Clusters (RAC)


Session ID: S291936


Abstract: Installing, cloning, and patching Oracle Real Application Clusters (Oracle RAC) consumes a lot of  time and effort. These projects involve nontrivial tasks, from performing cumbersome prerequisite checks to setting up application failover and load balancing. In this session, hear how Oracle Enterprise Manager Provisioning Pack automates the entire lifecycle of a clustered environment, from initial provisioning and patching to adding capacity on demand


 

Video Resources:

 


 

Document Resources:

 


TrackBack

TrackBack URL for this entry:
http://blogs.oracle.com/mte1521/mt-tb.cgi/5426

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About This Entry

This page contains a single entry from the blog posted on October 17, 2007 10:05 AM.

The previous post in this blog was Customer Success:How Telstra Saves with Centrally Managed Infrastructure.

The next post in this blog is OCT CPU 2007: Best practices for applying patches through EM.

Many more can be found on the main index page or by looking through the archives.

Top Tags

Powered by
Movable Type and Oracle