« July 2007 | Main | October 2007 »

September 2007 Archives

September 13, 2007

Updates:Apply July CPU 2007 (Napply CPU) using Deployment Procedures

Apply the latest patch- 6235191(re-uploaded) on the 10.2.0.3 OMS home and start using the new deployment procedure - Patch Oracle Database for napply CPUs/ Merge patches.

NapplyCPU:

This is an update to the previous process of editing a DP and attaching a new directive to handle this.

Follow up : Question #24 :Starting July 2007 Oracle has changed the patch application method for Critical Patch Updates (CPU) on 10.2.0.3 Databases (and beyond).Will Enterprise Manager based patching work for July07 CPU on 10.2.0.3 databases?
at Achieving Grid Automation with Deployment Procedures

Related Links:



  • Pre-req to use Provisioning pack 10.2.0.3 Deployment Procedures: 427577.1


September 24, 2007

Customer Success:How Telstra Saves with Centrally Managed Infrastructure


Telstra_ROI: 


In this ROI study published by Telstra and Mainstay Partners, learn how System Automation has freed up administrators time previously spent developing and managing homegrown scripts.


Through Oracle Enterprise Manager Release 2, Telstra is now able to take advantage of provisioning features that deploy and provision Oracle databases in Oracle Real Application Clusters (RAC) and non-RAC environments in a matter of hours.


Click on the Image above to access the pdf document

About September 2007

This page contains all entries posted to DataCenter Automation and Configuration Management in September 2007. They are listed from oldest to newest.

July 2007 is the previous archive.

October 2007 is the next archive.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type and Oracle