« GSI Architecture Strategy Part 1: Basics | Main | GSI Architecture Strategy Part 2: How Many? Network is Key. »

Maintenance Note Feb 2009

Like any good system, I try to perform periodic maintenance on the Project Lifestyle blog.

As I get more to grips with the Moveable Type blogging software I’ll make periodic updates & improvements.

This months updates were mainly about cleaning up the widgets – all the small sections of stuff on the right hand side of the screen.

Added an aggregated feed of posts from other project management oriented blogs (PM Blender Feed) and reordered the widgets to take contribution/comments and recent posts nearer to the top of the page.

TrackBack

TrackBack URL for this entry:
http://blogs.oracle.com/mte1521/mt-tb.cgi/10299

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About This Entry

This page contains a single entry from the blog posted on February 27, 2009 9:44 AM.

The previous post in this blog was GSI Architecture Strategy Part 1: Basics.

The next post in this blog is GSI Architecture Strategy Part 2: How Many? Network is Key..

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type and Oracle